
Technician performing post-treatment UV verification scan,
Sham Shui Po commercial kitchen corridor, Feb 2026.
Exposed: What's Living Behind Your Walls.
Property managers across forty-floor estates. Restaurant owners facing FEHD inspections. Data centre operators where one gnawed cable costs six figures. We eliminate before the next unit is breached.
Data based on 2,412 treatment records, Jan 2024 – Feb 2026. Audited quarterly.
Three Tiers.
One Standard.
Response times, treatment protocols, and warranty commitments — documented with the same rigour we apply on-site. No ambiguity. No small print.
| Parameter | Residential Estates & Private Blocks | Commercial Restaurants · Offices · Retail | Emergency Data Centres · Critical Infrastructure |
|---|---|---|---|
| Response Time | 24–48 hrs | 8–12 hrs | < 4 hrs |
| Treatment Methods |
|
|
|
| Warranty Period | 6 months | 12 months | 12 months |
| Re-inspection Schedule | Monthly × 3 | Bi-weekly × 6 | Weekly × 8 |
| Coverage Scope | Per unit + common areas | Full premises + drainage | Full facility + cable trays |
| Compliance Report | Digital PDF | FEHD-format certificate | Real-time digital dashboard |
| Emergency Callout | — | Included | Included |
Response times measured from confirmed booking. Warranty subject to quarterly access compliance. Full terms at fumigate.hk/terms.
The Cost of
Waiting One Week.
Every figure below is sourced from FEHD enforcement records, Buildings Department claims data, and HKPC surveillance reports. The numbers don't argue. They document.
German Cockroach (Blattella germanica)
A single breeding pair produces 280 offspring in one quarter. In a 40-floor estate, infestation spreads to adjacent units within 6 weeks via pipe chases and cable conduits.
Formosan Subterranean Termite (Coptotermes formosanus)
Hong Kong's most destructive urban pest. A mature colony of 3M workers consumes 13g of wood daily — undetected in concrete-encased timber for 18–24 months before visible damage.
Norway Rat (Rattus norvegicus)
In the 2024 FEHD annual inspection cycle, 47% of restaurant prosecutions cited rodent evidence. Average closure duration: 4.2 days. Average revenue loss: HK$68,000.
All Species — Pre-1980 Structures
Buildings constructed before 1980 show 3.4× higher infestation rates due to degraded pipe seals, unlined drainage channels, and timber sub-flooring. Kowloon City and Sham Shui Po districts lead in reports.
Rodent Cable Damage
Three documented incidents in Hong Kong data centres in 2024. Rodents target cable insulation for nesting material. Standard pest control gaps in raised floor plenum spaces are the primary entry vector.
Cost of Inaction — Commercial Kitchen
FEHD inspection cycles operate on 6-week intervals in Category A premises. First-sighting to prosecution averages 6.2 weeks. Post-prosecution, re-inspection is mandatory within 14 days — at operator expense.